Now for Something Completely Different The Obere Wasserschlosskammer...Incredible! Starts at :50 sec.

Obere Wasserschlosskammer - Like something from a James Bond movie
Completely Different Three turbines are turned off for 85% (approximately 60m³ per second, equivalent to 240MW) of their power for test purposes. At the beginning of the film, the machines are already stopped, so the rushing takes about 50 seconds until the water flows into the compensation chamber. Approximate size of the chamber about 80m long 15m wide and at the end it is filled 2m. Here is a video of the chamber without water https://youtu.be/pU5fkv1xVW0

Action starts at :50 seconds...