Deep Hydroelectric hole
This hole is in Austria at the bottom of lake Feldsee, and it is a part of a hydroelectric power plant.
The total drop height will be 524 meters, where this hole is 450 meters deep.
Alpine Meyreder was the main contractor for the hole project, and Bergteamet was the sub contractor drilling this hole.
Attached is the video of the drill that was used.
Loading the player ...
Loading the player ...
Added: Jun-2-2012 Occurred On: Jun-2-2012
By: bandit1200
In: Other Entertainment
Tags: Deep, Hydroelectric, hole, Power, Drill
Location: Austria (load item map)
Marked as: approved, featured
Views: 44426 | Comments: 169 | Votes: 7 | Favorites: 9 | Shared: 52 | Updates: 0 | Times used in channels: 2
By: bandit1200
In: Other Entertainment
Tags: Deep, Hydroelectric, hole, Power, Drill
Location: Austria (load item map)
Marked as: approved, featured
Views: 44426 | Comments: 169 | Votes: 7 | Favorites: 9 | Shared: 52 | Updates: 0 | Times used in channels: 2
You need to be registered in order to add comments! Register HERE
View comments (169)
Media
Advertisement below
|
|
| Liveleak on Facebook | |
|
LIKE Liveleak.com |
Items
-
A Sleepover With Saddam
-
DIY: Tesla Coil Gun
-
Reason why 'Man’s penis chiseled off, anus clobbered by tool in thug attack!'
-
Power drill
-
Handy Man's Power Drill Used For Brain Surgery
-
The view from Gaza.
-
Police: Man Drills Into Dog's Head
-
Tesla Roadster-The car of the future
-
Dad Accused Of Throwing Baby In Construction Hole
-
Enormous sinkhole could swallow Pennsylvania restaurant
-
Administration halts prosecution of alleged USS Cole bomber
Advertisers




